Design & Planning As Built Client Portal Part L Photo Evidence 01386 365145 Get a Quote
Part L · Design & Planning

SAP Calculations & EPCs
in Warwickshire

OCDEA-accredited SAP and EPC delivery across all 5 Warwickshire districts — Warwick, Stratford-on-Avon, Rugby, North Warwickshire and Nuneaton & Bedworth. From £95+VAT per dwelling. 3-5 day turnaround. Local knowledge of every Warwickshire Local Plan.

OCDEA
accredited assessors
EES/030713
3-5 day
typical turnaround
urgent slots available
5 LPAs
covered across Warwickshire
every district policy

Get a Quote

OCDEA accredited · 3-5 day turnaround across Warwickshire

Thanks — we'll confirm pricing and turnaround within one working day.

Accredited by
OCDEA EES/030713
Elmhurst Energy accredited scheme
Part L 2021 England compliant

Local OCDEA assessors covering all five Warwickshire districts.

SAP calculations Warwickshire

Warwickshire has five Local Planning Authorities — Warwick District, Stratford-on-Avon District, Rugby Borough, North Warwickshire Borough, and Nuneaton & Bedworth Borough. Each operates its own Local Plan, with sub-regional coordination through the emerging Coventry-Warwickshire Joint Strategic Plan. We work with all five on a regular basis. Build Envelope is OCDEA-accredited (EES/030713) and based in Worcester — around 45 minutes from Warwick.

SAP (Standard Assessment Procedure) is the government-approved method for calculating the energy performance of new build dwellings. It is required at Design Stage to demonstrate compliance with Part L of the Building Regulations, and again at As-Built stage before an EPC can be issued.

Stratford-on-Avon District includes large parts of the Cotswolds AONB and significant historic conservation areas, where sustainability and heritage requirements interact. Warwick District's Local Plan 2017 sets ambitious energy targets, and Rugby's Local Plan covers extensive new housing growth. We understand what each Warwickshire LPA expects in submitted documentation.

Whether you are submitting outline planning, reserved matters, or seeking a fully accredited SAP and EPC, we deliver in 3-5 working days. Need it faster? Tell us — we routinely accommodate urgent turnarounds across Warwickshire.

Part L 2021 compliance

DER ≤ TER
Dwelling Emissions Rate must be lower or equal to Target Emissions Rate — Part L 2021, England
Warwickshire Local Plans go beyond Part L baseline. Warwick and Stratford-on-Avon both set policy energy targets for major schemes — we model your spec against both Part L and the relevant district policy.
EPC ratings: A (92+), B (81-91), C (69-80). Most Warwickshire new builds need a B or higher; certain LPA conditions require A.

How a SAP calculation runs from drawings to EPC.

SAP is desk-based, so location within Warwickshire makes no difference to delivery. We typically issue Design Stage in 3-5 working days from a complete information pack, with urgent turnarounds available on request.

01
Information pack & quote
Send us your architectural drawings, intended construction U-values, window and door schedule, heating and ventilation strategy, and any planned renewables. We confirm scope and price within one working day.
02
Design Stage modelling
We model each dwelling type in accredited SAP 10 software, comparing the Dwelling Emissions Rate against the Target Emissions Rate. Your spec is checked against Part L 2021 and applicable Warwickshire Local Plan policy.
03
Spec optimisation
If a dwelling fails or is marginal, we model the lowest-cost route to compliance — typically tweaking U-values, glazing, air permeability target, ventilation strategy, or renewables — and feed those back to the design team.
04
As-Built SAP & EPC
Once construction completes and we receive air test results and as-built confirmations, we re-run SAP and lodge the EPC. Full compliance pack issued in the format required by Warwickshire Building Control teams.

What we need from you to start your Warwickshire SAP.

The faster you send us a complete information pack, the faster we deliver. A typical 3-5 day turnaround starts the day we have everything we need — partial packs are still fine, we'll just flag what's missing and assume sensible defaults until you confirm.

If your design team is mid-process, send what you have. SAP works best as an iterative tool: we can run an early model on indicative U-values and a notional heating system, then refine as your specification firms up. That's often quicker than waiting for the perfect pack.

For Warwickshire schemes with planning conditions tied to a specific energy target — common in Warwick District and Stratford-on-Avon — tell us the condition wording at the start. We model your spec directly against it, so the report you receive is one your case officer can sign off without coming back for clarifications.

SAP information checklist

Architectural drawings Plans, sections and elevations — PDF or DWG. Scaled drawings preferred so we can extract dimensions accurately.
Construction U-values Wall, roof, floor, and party-element build-ups with target U-values. We can calculate U-values from build-ups if needed.
Window & door schedule U-values, g-values, and frame factor where known. Manufacturer datasheets are ideal.
Heating system Boiler, heat pump, or other — including make, model, and efficiency where specified. Hot water cylinder details if applicable.
Ventilation strategy Natural, MEV, or MVHR — and the intended air permeability target.
Renewables PV array size, heat pump details, or any other low-carbon technology proposed for the scheme.

SAP delivery across all five Warwickshire planning authorities.

Local knowledge of each Warwickshire LPA's Local Plan policies, sustainability requirements, and planning condition templates.

Warwick District Council
Warwick, Royal Leamington Spa, Kenilworth, Whitnash. Warwick District Local Plan 2017 with ambitious energy targets.
Stratford-on-Avon District
Stratford-upon-Avon, Alcester, Shipston-on-Stour, Studley. Cotswold AONB coverage and historic conservation areas throughout.
Rugby Borough Council
Rugby, Hillmorton, Bilton, Houlton. Major housing growth under the Rugby Local Plan.
North Warwickshire Borough
Atherstone, Coleshill, Polesworth, Kingsbury. Industrial and rural housing mix.
Nuneaton & Bedworth Borough
Nuneaton, Bedworth, Bulkington. Brownfield housing pipeline.
Wider England & Wales
OCDEA-accredited SAP and EPC delivery beyond Warwickshire — your local LPA, our remote-first delivery.

SAP location pages: Worcestershire, Birmingham & West Midlands, Bristol & Somerset, Gloucestershire

Common questions about SAP calculations in Warwickshire.

SAP calculations start from £95+VAT per dwelling in Warwickshire. Pricing depends on dwelling type, the number of plots, and whether you need Design Stage only or both Design Stage and As-Built EPC.

Larger schemes are quoted on a per-plot basis with volume discounts. There are no additional travel charges — SAP is desk-based and we deliver remotely across all five Warwickshire districts.

Standard turnaround is 3-5 working days from receipt of a complete information pack. For urgent submissions we routinely accommodate faster delivery — tell us your deadline when you enquire and we will confirm whether we can hit it.

Because SAP is desk-based, location within Warwickshire makes no difference to turnaround. Call us on 01386 365145 if you have a specific date you need to hit.

Warwick District Council and Stratford-on-Avon District Council typically require Design Stage SAP for major residential applications, particularly under their adopted Local Plan energy policies. Both LPAs have specific energy targets that go beyond the Part L 2021 baseline.

Rugby Borough, North Warwickshire Borough, and Nuneaton & Bedworth Borough operate similar thresholds, with local variation in policy weighting. We tailor each report to the relevant LPA's submission templates and condition wording.

If your initial SAP run shows the Dwelling Emissions Rate exceeding the Target Emissions Rate, we model the lowest-cost spec changes that bring you into compliance. That usually means tweaking U-values, glazing specification, air permeability target, ventilation strategy, or adding renewables.

We work iteratively with you and the design team rather than just flagging the failure — the goal is a compliant scheme, not a list of problems.

Yes. We deliver SAP calculations across all five Warwickshire planning authorities — Warwick District, Stratford-on-Avon District, Rugby Borough, North Warwickshire Borough, and Nuneaton & Bedworth Borough.

Build Envelope is OCDEA-accredited (EES/030713) and based in Worcester, around 45 minutes from Warwick. SAP is desk-based so distance has no impact on delivery time or cost.

Yes — this is a frequent project type for us. Stratford-on-Avon District includes large parts of the Cotswolds AONB and significant historic conservation areas where heritage and energy requirements interact.

Heritage windows and traditional construction details can be specified within SAP at appropriate U-values, and we are experienced at finding spec routes that satisfy both conservation officers and Part L. Tell us about any heritage constraints when you send the information pack.

Yes. Alongside SAP and EPC we deliver air tightness testing, ventilation flow rate testing, U-value calculations, PSI-value calculations, water usage calculations, overheating assessments, and energy statements.

Coordinating the full Part L pack through one accredited provider avoids the gaps and contradictions that hold up Building Control sign-off — a common pain point on Warwickshire schemes split across multiple consultants.

3-5 day turnaround

Ready to start your Warwickshire SAP?

From £95+VAT per dwelling. 3-5 day turnaround across all 5 districts. Send us your drawings — quote within one working day.

Get a Quote →